HomeBiofuelsBio HeatingFactsOur ServicesContact Us

Storing

Location and Filling

Like other fuels, also peat is best placed the closest to the heating plant as possible. Filling the storage with peat is done with a dumper truck or a tractor, by tipping or using a bottom unloader.

Different filling options must be considered when planning the logistics, the storage silo and its location. The entrance to the main silo must be large enough for big machines.

Strong and Durable Foundation

The ground under the storage and around it must have high bearing capacity because of heavy machines. If there is need to move the peat with a front loader, for example from an intermediary storage to the heating plant, the bottom of the storage must be made of concrete to avoid impurities.


REGATECENREGRENEXPOCEB
EUBCEBiofuels-2015Bioenergia 2015Agritechnica 2015RENEXPO BucharestACERC
Power & Energy Africa 2015 KenyaPower & Energy Africa 2015 in Dar-es-Salaam, Tanzania.RENEXPO® BiHtcbiomass2015: Technology for the Bioeconomy
http://kbh.my.gov.cn/http://www.filtechasia.com/en/index.asp
http://www.expogr.com/kenyaenergy/index.phphttp://www.renexpo-belgrade.com/index.php?id=7&L=1http://www.apbechina.com/index.php?lang=enhttp://www.silverindustry.cn/en/index.htm
http://expogr.com/ethiopia/powerenergy/index.phphttp://expogr.com/rwanda/powerenergy/index.phphttp://www.expogr.com/tanzania/powerenergy/index.phphttp://www.silverindustry.cn/en/index.htm
http://www.gehe.cn/index.php?lang=en